Salient Features

Salient Features of Project

Particulars Details/Status
Project Name Construction of Four/Six lane Greenfield Ludhiana – Rupnagar National Highway no. NH-205K from junction with NE-5 village near to Manewal (Ludhiana) to junction with NH-205 near Bheora Village (Rupnagar) including spur to Kharar with Ludhiana bypass under Bharatmala Pariyojana in the State of Punjab on Hybrid Annuity Mode, Package-1 (Section from Design Ch. 0.000 To Design Ch.37.700, total length 37.700 km)
NH No. (New/old) NH-205K
Scheme/Phase Bharatmala Pariyojana
Mode of Execution Hybrid Annuity Mode (HAM)
Concessionaire Name M/s G R Ludhiana Rupnagar Highway Private Limited
Date of Letter of Award (LOA) 30.09.2021
Appointed Date 12.12.2022
Construction Period (in Days) 730 Days from the Appointed Date
Schedule Completion Date 10.12.2024
Operation & Maintenance Period 15 years from COD
Independent Engineer M/s FP India Project Management Consultancy Services Pvt. Ltd. in JV with Chaitanya Projects Consultancy Pvt. Ltd. in association with Indian Engineering Consultants India Pvt. Ltd.
Authority Name National Highways Authority of India, PIU-Ludhiana
No. of Lanes/ Configuration 4/6 Lane
Bid Project Cost 951.00 Cr.
Total Length of the Project 37.700 km
Length of Slip Road 8.300 km
No. of Interchanges 03 nos.
No. of ROB 01 no.
No. of Flyovers 04 nos.
No. of Underpasses VUP-10 nos., SVUP-14 nos.
No. of Minor Bridges 01 no.
No. of Box Culverts 85 nos.
Toll Plaza 02 nos. (on MCW) & 03 nos. (on Ramps)